Excavator Disassembled Boom Lifted and Loaded for Shipment
Views :
Update time : 2026-08-26
The disassembled main boom of the heavy-duty excavator is currently being safely lifted and loaded onto the transport vehicle via professional crane operation.
To meet oversize transportation standards and ensure long-distance shipping safety, the excavator’s large boom was professionally disassembled in advance. On-site workers coordinated the whole lifting process, precisely controlling the balance, angle and height of the boom to avoid collision and damage. Every loading step is carried out in strict accordance with international freight safety specifications.
Disassembly and separate lifting effectively reduces transportation volume, complies with road and marine transport regulations, and guarantees intact delivery of the construction machinery.
After completing all component loading and fastening procedures, the full set of excavator parts will be delivered to the port and shipped overseas for local infrastructure construction projects.