Ruimao

NEWS
NEWS

Excavators Fully Loaded at Factory Gate, Ready for Overseas Departure

Views :
Update time : 2026-08-28

Excavators Fully Loaded at Factory Gate, Ready for Overseas Departure

Release Date: 2026‑08‑28

The excavators have completed final factory inspection and performance testing. Machines are securely loaded onto transport trucks right at the factory gate, ready to start their journey for overseas customers.

Before loading, every unit went through full‑function tests covering hydraulic system, digging power and cab operation, to guarantee stable performance under tough mining and land‑clearing site conditions. Workers fastened the machines firmly on flatbed trucks for safe land transit to port.

This batch of equipment will soon reach the destination country, supporting local open‑pit mining, overburden stripping and land‑clearing projects. Our one‑stop service covers production, factory testing, loading arrangement and spare‑parts backup, helping overseas operators reduce project downtime.

We keep supplying durable heavy‑duty excavators, bulldozers and related spare parts for South‑American, African mining clients. Fast lead‑time and reliable after‑sales support remain our core advantages for global partners.


Related News
Read More >>
Excavators Fully Loaded at Fac Excavators Fully Loaded at Fac
08 .28.2026
Excavators Fully Loaded at Factory Gate, Ready for Overseas DepartureRelease Date: 2026‑08‑28The exc...
Disassembled Excavator Spare P Disassembled Excavator Spare P
08 .28.2026
Disassembled Excavator Spare Parts Loaded for Overseas ShipmentDisassembled and well‑packaged excava...
38‑Ton Excavator Loaded and Re 38‑Ton Excavator Loaded and Re
08 .26.2026
Recently, a 38‑ton heavy‑duty crawler excavator has been safely loaded onto the heavy‑duty flat‑bed ...
38-Ton Excavator Cab 180° Rota 38-Ton Excavator Cab 180° Rota
08 .26.2026
A 38-ton heavy-duty crawler excavator has been successfully loaded onto the flatbed truck and comple...