Release Date: 2026‑08‑28
The excavators have completed final factory inspection and performance testing. Machines are securely loaded onto transport trucks right at the factory gate, ready to start their journey for overseas customers.
Before loading, every unit went through full‑function tests covering hydraulic system, digging power and cab operation, to guarantee stable performance under tough mining and land‑clearing site conditions. Workers fastened the machines firmly on flatbed trucks for safe land transit to port.
This batch of equipment will soon reach the destination country, supporting local open‑pit mining, overburden stripping and land‑clearing projects. Our one‑stop service covers production, factory testing, loading arrangement and spare‑parts backup, helping overseas operators reduce project downtime.
We keep supplying durable heavy‑duty excavators, bulldozers and related spare parts for South‑American, African mining clients. Fast lead‑time and reliable after‑sales support remain our core advantages for global partners.
Close-up View: Hoisting Excava
Container Sealed & Bulk Fi
Smooth Loading of Excavator Sl
Large Batch of Excavators Read